翻訳と辞書
Words near each other
・ Nanjing University of Science and Technology
・ Nanjing University of Technology
・ Nanjing University of Technology Station
・ Nanjing University of the Arts
・ Nanjing University Xianlin Campus Station
・ Nanjing War Crimes Tribunal
・ Nanjing West Railway Station
・ Nanjing West Road Station
・ Nanjing World Trade Center Tower 1
・ Nanjing Yangtze River Bridge
・ Nanjing Yangtze River Tunnel
・ Nanjing Yoyo F.C.
・ Nanjing Yuejin Soyat
・ Nanjing yunjin brocade
・ Nanjing Zhonghua High School
Nanjing–Anqing Intercity Railway
・ Nanjing–Gaochun Intercity Railway
・ Nanjing–Hangzhou Passenger Railway
・ Nanjing–Qidong Railway
・ Nanjing–Tianchang Intercity Railway
・ Nanjing–Tongling Railway
・ Nanjing–Wuhu Railway
・ Nanjing–Xi'an Railway
・ Nanjizal
・ Nanjo Bunyu
・ Nanjua
・ Nanjun 610-class dredger
・ Nanjundeswarar temple, Karamadai
・ Nanjundi
・ Nanjundi Kalyana


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Nanjing–Anqing Intercity Railway : ウィキペディア英語版
Nanjing–Anqing Intercity Railway

The Nanjing–Anqing Intercity Railway is an under-construction high-speed rail, passenger-dedicated line between cities of Nanjing, Jiangsu Province and Anqing, Anhui Province, in China.
As of mid-2012, the 257 km line was scheduled to be completed by July 2014.〔(宁安城际铁路全线恢复施工 ) (Work along the entire Ning-An Intercity Railway to resume), 2012-07-20〕 Later, the opening date was pushed back to October 2015.
This railway will become a branch of the Beijing–Shanghai High-Speed Railway. The route will run parallel to the Yangtze River, and will pass through Ma'anshan, Wuhu, Tongling, and Chizhou. 33 km of the railway will be located in Jiangsu, with 225 km in Anhui.
The total investment is predicted to be 25.702 billion RMB, provided by the Railway departments of Jiangsu province and Anhui province. The railway is expected to take 4.5 years to complete.〔
Most of the line runs along the southern bank of the Yangtze, but Anqing is located on the northern side of the river. The Anqing Railway Bridge is being constructed 22 km before the Anqing station. The bridge will also serve the Fuyang-Jingdezhen Railway. As of October 2012, it is expected that the main span of the bridge will cross the river by the end of the year, and the bridge fully completed by May 2013.〔(安庆宁安城际铁路长江大桥今年元旦前合龙(图) )〕
==Operation==
The capacity is estimated to be about 125 pairs of trains each day.〔 The trains will have a top speed of 250 kilometers per hour, with the entire journey taking 90 minutes. The current travel time between the two cities is 8 hours. It will also allow passengers to travel between Anqing and Shanghai in 3 hours, compared to the current 12 hours. This new railway will be connected to the Yangtze River Delta region's railway network.〔
Trains are expected to be in service each day from 06:00 to 12:00. 60 pairs of trains will be in operation with a minimum interval between trains of 4 minutes, and an average interval of 15 minutes.
The cost to passengers will be 0.4 to 0.5 RMB (4 to 5 mao) per kilometre.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Nanjing–Anqing Intercity Railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.